Altech Advanced Materials AG
ISIN: DE000A31C3Y4
WKN: A31C3Y
17 March 2025 09:34AM

EQS-News: CERENERGY project receives environmental and building permit for its production plant

Altech Advanced Materials AG · ISIN: DE000A31C3Y4 · EQS - Company News
Country: Germany · Primary market: Germany · EQS NID: 2101286

EQS-News: Altech Advanced Materials AG / Key word(s): Miscellaneous
CERENERGY project receives environmental and building permit for its production plant

17.03.2025 / 09:34 CET/CEST
The issuer is solely responsible for the content of this announcement.


CERENERGY project receives environmental and building permit for its production plant
  • CERENERGY battery plant with an annual production capacity of 120 MWh planned in Schwarze Pumpe, Saxony
  • Environmental and building permit (BImSchG) is another important step in the implementation of the CERENERGY project
  • Direct investments totaling around EUR 156 million expected
Heidelberg, 17.03.2025 - Altech Advanced Materials AG ("AAM" or the "Company"; ISIN: DE000A31C3Y4) announces that Altech Batteries GmbH (ABG) has been granted the environmental and building permit including the immission control permit in accordance with the Federal Immission Control Act (“BImSchG”) for the 120 MWh CERENERGY GridPack production plant in Schwarze Pumpe, Saxony, without any further conditions. With this approval, ABG is now in a position to start clearing the construction site and building the battery plant. Discussions are currently being held with banks and investors about financing the CERENERGY project. At the same time, several funding applications have been submitted at federal and state level. Altech expects investment costs for the CERENERGY battery plant to total around EUR 156 million.

A number of preparatory measures for the construction of the CERENERGY battery plant have already been successfully completed. The final assembly of the first CERENERGY battery prototype "BatteryPack ABS60" was carried out in cooperation with the joint venture partner Fraunhofer IKTS in Dresden. Extensive tests have clearly exceeded expectations. In addition, letters of intent were signed with a total of three companies for the acceptance of the majority of the plant's planned production capacity.

It is to be expected that the environmental and building permit that has now been granted will have a positive influence on the ongoing talks with potential investors. 

Uwe Ahrens, CEO of Altech Advanced Materials AG, said: "We are delighted to have received the final building permit for our 120 MWh CERENERGY battery project. This is another important step in the realization of the CERENERGY project and a clear signal to potential investors, providing additional security and confidence. The CERENERGY project is now ready for implementation at an operational level. The market is waiting for our innovative battery technology, as the letters of intent that have already been signed clearly demonstrate."

About Altech Advanced Materials AG
Altech Advanced Materials AG (ISIN: DE000A31C3Y4), based in Frankfurt am Main, is a holding company listed on the regulated market of the Frankfurt Stock Exchange. The company's aim is to participate in the market for solid-state batteries for stationary battery applications with CERENERGY.

Another focus is on lithium-ion batteries. An innovative anode material based on high-purity aluminum oxide (HPA) - Silumina Anodes - is intended to significantly increase the performance of this battery for electromobility.

Further information: www.altechadvancedmaterials.com

About CERENERGY
CERENERGY is a new type of sodium chloride solid-state battery for stationary operation that combines unique properties, making it an efficient and resource-saving alternative to current lithium-ion batteries. The battery, which consists of common salt, nickel and ceramics, does not require critical materials such as graphite, lithium and cobalt, which fluctuate greatly in price. All materials can be sourced from Europe, minimizing dependencies in the supply chain. The battery has a service life of over 15 years. It is non-flammable and can be operated outdoors in all climatic conditions without separate cooling or heating and is completely recyclable. Considering full costs and daily charging cycles, it promises a cost advantage of around 50% compared to conventional lithium-ion batteries in stationary operation. A first production plant is currently being planned in Schwarze Pumpe, Saxony. The relevant building applications have been submitted, the land acquired and the production design drawn up. The battery chemistry is based on a proven technology that the Fraunhofer Institute IKTS has been successfully testing and operating as various prototypes for more than 8 years. An industrial prototype of the 60kWh BatteryPack has been commissioned for potential customers to test and three letters of intent have recently been signed for the purchase of the 120 MWh CERENERGY batteries to be produced annually.

Altech Advanced Materials AG
The Executive Board: Uwe Ahrens, Hansjörg Plaggemars
Ziegelhäuser Landstrasse 3
69120 Heidelberg
info@altechadvancedmaterials.com
Tel: + 49 6221 649 2482
www.altechadvancedmaterials.com

Press contact:
Ralf Droz / Doron Kaufmann, edicto GmbH
Tel: +49 (0) 69 905505-54
E-Mail: AltechAdvancedMaterials@edicto.de

 


17.03.2025 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group.
The issuer is solely responsible for the content of this announcement.

The EQS Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at www.eqs-news.com


Language: English
Company: Altech Advanced Materials AG
Ziegelhäuser Landstraße 3
69120 Heidelberg
Germany
Phone: +49 6221 6492482
E-mail: info@altechadvancedmaterials.com
Internet: www.altechadvancedmaterials.com
ISIN: DE000A31C3Y4
WKN: A31C3Y
Listed: Regulated Market in Frankfurt (General Standard); Regulated Unofficial Market in Berlin, Dusseldorf, Munich, Tradegate Exchange
EQS News ID: 2101286

 
End of News EQS News Service

2101286  17.03.2025 CET/CEST

Boersengefluester.de (BGFL) provides an overview of the key figures on sales, earnings, cash flow and dividends to help you better assess the fundamental development of the respective companies. All information is entered manually in our database - the source is the respective annual reports. All estimates for future figures are provided by BGFL.

The most important financial data at a glance
  2019 2020 2021 2022 2023 2024 2025e
Sales1 0,14 0,02 0,00 0,00 0,08 -0,75 0,00
EBITDA1,2 -0,33 -0,62 -0,73 -0,78 -1,50 0,00 0,00
EBITDA-Margin3 -235,71 -3.100,00 0,00 0,00 -1.875,00 0,00 0,00
EBIT1,4 -0,41 -0,62 -0,73 -1,28 -1,50 0,00 0,00
EBIT-Margin5 -292,86 -3.100,00 0,00 0,00 -1.875,00 0,00 0,00
Net Profit (Loss)1 -0,41 -0,62 -0,88 -1,43 -1,65 -0,81 0,00
Net-Margin6 -292,86 -3.100,00 0,00 0,00 -2.062,50 108,00 0,00
Cashflow1,7 0,03 -1,31 -0,75 -0,69 -0,98 0,00 0,00
Earnings per share8 -0,38 -0,24 -0,16 -0,20 -0,22 -0,10 -0,39
Dividend per share8 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Quelle: boersengefluester.de and Company information
Explanation

1 in Mio. Euro; 2 EBITDA = Earnings before interest, taxes, depreciation and amortisation; 3 EBITDA in relation to sales; 4 EBIT = Earnings before interest and taxes; 5 EBIT in relation to sales; 6 Net profit (-loss) in relation to sales; 7 Cashflow from operations; 8 in Euro; Source: boersengefluester.de

Auditor: Nexia

All relevant valuation ratios, dates and other investor information on your share at a glance. Good to know: All data comes from boersengefluester.de and is updated daily. This means you are always up to date. You can get brief explanations of the key figures by moving the cursor or mouse over the relevant field.

INVESTOR-INFORMATION
©boersengefluester.de
Altech Advanced Materials
WKN ISIN Legal Type Marketcap IPO Recommendation Plus Code
A31C3Y DE000A31C3Y4 AG 15,77 Mio € 13.07.2011 Kaufen 8FXCCP86+63
* * *
PE 2026e PE 10Y-Ø BGFL-Ratio Shiller-PE PB PCF KUV
-7,65 10,00 -0,77 -15,08 1,79 -16,10 202,14
Dividends
Dividend '2022
in €
Dividend '2023
in €
Dividend '2024e
in €
Div.-Yield '2024e
in %
0,00 0,00 0,00 0,00%
Financial calendar
Annual General Meeting Q1-figures Q2-figures Q3-figures Annual press conference
30.04.2025 19.07.2024 10.04.2025
Performance
Distance 60-days-line Distance 200-days-line Performance YtD Performance 52 weeks IPO
Last Price (EoD)
-7,01%
1,99 €
ATH 17,50 €
-28,34% -33,62% -27,90% -68,91% -84,69%

Advertising is an important revenue channel for us. But we understand, that sometimes it becomes annoying. If you want to reduce the number of shown ADs just simply login to your useraccount and manage the settings from there. As registered user you get even more benefits.
          Qualitätsjournalismus · Made in Germany © 2025          
The news manufactory

Good luck with all your investments

Founded in 2013 by Gereon Kruse, the financial portal boersengefluester.de is all about German shares - with a clear focus on second-line stocks. In addition to traditional editorial articles, the site stands out in particular thanks to a large number of self-developed analysis tools. All tools are based on a completely self-maintained database for more than 650 shares. As a result, boersengefluester.de produces Germany's largest profit and dividend forecast.

Contact

Idea & concept: 3R Technologies   
boersengefluester.de GmbH Copyright © 2025 by Gereon Kruse #BGFL